Toimintaperiaate / asennus
- The FID can be set in the insulating board with a cordless screwdriver or by hand.
- For thick layers of plaster a pre-drilling (6 mm) is recommended.
- The special spiral thread taps itself in the insulating board.
- Water ingress in the insulation can be prevented by sealing the plug collar with a suitable sealant after successful pre-positioned installation.